Mantaro ROV: How Has Technology Evolved?
The Mantaro ROV was designed and built by ASI Group in the early 1990s to support the inspection of a 20-km-long intake tunnel transporting water from the Mantaro River at the Tablachaca Dam to the Santiago Antúnez de Mayolo Hydroelectric Plant (SAM), still...